There are several construction projects for which we need short-term help:
Renovation of the clinic’s men’s ward, children’s ward, pharmacy, administration offices, and other rooms (Phase 3 of EMI Project #5483); at least a basic knowledge of construction preferred, higher-level desired, in one of the following; carpentry, painting, ceramic floor tile installation, electrical or general construction. (short term)
Install wire to upgrade the compound electrical system. Short-term with the preference of volunteers having electrical experience. This team will upgrade underground wiring to existing structures and run a new line to hospital. They will “clean up” current panel boxes to assure better service.
*Specialized Solar Crew to install a completely new solar system in the clinic. Installation of solar rack and panels and wiring, installation of inverters, batteries, and all components of the system. This system will be designed by qualified technicians with instructions for installation but electrical and solar experience needed and general construction experience helpful. (short-term)
Complete a water system for the public which includes installation of solar panels, pumps, water lines, and electricity for the public water system. Knowledge of electric, plumbing, and solar systems helpful. (short-term)
Install a solar rack, solar panels, submersible pump, waterline, and electricity to provide water to the local clinic and staff. Knowledge of electric, plumbing, and solar systems helpful. (short-term)